Project description: Kambarata HPP. The site of the Kambarata HPP-1 dam is located on the river. Naryn in a V-shaped canyon, 14 km above Kambarata HPP-2 Initiator: Kyrgyz Republic.
Location: Jalal-Abad region Project cost: 2 billion 869 million US dollars Project payback: 10 years A feasibility study has been developed (by SNC Lavalin International Inc. Corporation).
There is a production infrastructure that was used in the construction of the Kambarata HPP-2. There are sufficient quarry reserves of building materials for the construction of the Kambarata HPP-1 dam. The immediate proximity of the national highway and the 500 kV power line connecting the north and south of the country.
- Will become the most powerful hydroelectric power station and the largest dam with a height of 265 m in Central Asia
- Land plots with an area of 6318.8 hectares have been allocated
- Key hydroelectric power station for the full implementation of the CASA-1000 project
- Construction period is 8 years.
Financing the construction of a 3-hydroelectric power station project with a total installed capacity of 1305 MW with an average annual output of 3317 million kWh, including: Karakolskaya-33 MW Kokomerenskaya 1-360 MW Kokomerenskaya 2-912 MW Total cost of the project Approximately 3.34 billion US dollars Attribution of the object to the territory of the Zhaiyl district of the Chui region and the Toktogul district of the Jalal-Abad region. Place of location and registration of the investment object The Kyrgyz Republic Suusamyr-Kokomerensky cascade of hydroelectric power stations (hereinafter referred to as SCC) is located on the Kokomeren river, which is a tributary of the Naryn river. The catchment area is 10,400 sq. km, length – 199 km. The average height of the basin is 2737 m. The highest average monthly temperature is 39º Celsius in the area of the village of Chaek, the lowest temperature is minus 37º Celsius. The goal of the project is to increase the country’s energy capacity and generate electricity to cover the growing load in the energy system.
The final results of the project implementation The volume of energy generated over the average long-term period will be with an average annual output of 3317 million kWh. Impact of the project on the environment The construction project does not have any negative impacts on the environment. Sources of debt repayment Funds from the sale of electricity. Plans for the sale of finished products Production and sale of electricity in the domestic and foreign markets.